Z-Stage Assembly

Building the Z Stage should take approximately 15 minutes.

Parts List

These are the parts you’ll need to assemble the Z Stage. All laser-cut parts should have their names etched into them. Find and put aside these parts:
flickr:5159073936

  • Laser-cut Stage Parts
    • Z Back
    • Z Top
    • Z Bottom
    • Z Left Side
    • Z Right Side
    • Z Ribs
  • One Z Motor Flange*
  • Four (4) M3x10 socket cap bolts or Four (4) M2x10 socket cap bolts with nuts*
  • Eighteen (18) M3x16 socket cap bolts
  • Eighteen (18) M3 nuts
  • Four (4) 3/8″ self-aligning bearings*

*These parts should have been put in place during the preparation stage.

Attach Ribs to Back

Parts needed:

  • 2 Z Ribs
  • Z Back
  • 2 M3x16 socket cap bolts
  • 2 M3 nuts

Secure the two Rib pieces to the Back. These ribs are symmetrical, so they just need to look like the picture.

Attach Left, Right and Bottom to Back

Parts needed:

  • Assembled back
  • Z Left
  • Z Back
  • 11 M3x16 socket cap bolts
  • 11 M3 nuts

Secure the Left and Right sides to the Back. In the newest versions the printed text goes right-side-up on the inside. In older versions (pictured below) the printed text goes on the outside and ends up upside-down. After securing Left and Right sides, attach to the Bottom (pay attention to the orientation of the self-aligning bearings).


Attach Top to Assembly

Parts needed:

This will lock things in place nicely. This piece is also symmetrical.

Tighten It All Down

Now that it’s all together, tighten all the bolts with 1/4- to 1/3-turns past hand tight.

Congratulations! Your Z Stage is now complete!

9 Comments so far

  • Rich Thall
    September 29, 2011 at 10:50 pm
     

    In comparing the Educator instructions with the wiki instructions, I noticed that the bearings and motor flange magically appear in the educator images without mention in the text. If this is an oversight, you may wish to correct it; or I may have missed something.

     
  • Rich Thall
    September 29, 2011 at 10:55 pm
     

    Please ignore the last comment, I see the bearings and flange are inserted in the Prep step. Sorry.

     
  • James Mossman
    October 13, 2011 at 9:28 pm
     

    Are there only 5 bolts in the last step, not 6?

     
  • Kim Lam
    December 9, 2011 at 2:16 am
     

    Where do I use the M3x10 nuts ?

     
  • Ben Harris
    December 15, 2011 at 8:55 pm
     

    The motor flange was already attached in the prep step.

     
  • Red L
    December 19, 2011 at 2:44 pm
     

    hi. my montor flange is is attached to moons stepping motor. i cant manage to remove in order to screw it to the laser cut piece.

    could someone advise please.

     
  • Makerbot Dualtrusion build – Z stage | artbot2
    December 23, 2011 at 2:15 pm
     

    [...] for this stage were taken from here and here in the preparation [...]

     
  • Ethan
    Ethan
    December 29, 2011 at 5:51 pm
     

    @Red L

    Please get in touch with us at support@makerbot.com if you’re still having issues — the flange should be easy to remove from your motor.

     
  • Hasan
    February 7, 2012 at 8:24 am
     

    M3 bolt cannot enter the Flange hole(s) !!! …there are no M2x10 provided :(

    Im stuck now !

    HELP

     
 

Leave your comment

 
 
 

xhtml: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>